CITY OF HAMILTON UPDATE Breakwater Update The Northeast Breakwater is finally above the surface and attenuating waves. Kehoe is remaining on site, making arrangements for and attaching additional barrels for redundancy regarding flotation. They will attempt to make small repairs to seal the cracks in the breakwater only – not for structural repairs. Kehoe is also attaching ‘keepers’ to the …
Attenuation Wall / Docks & Amenities Update – June 1
Breakwater Update Great progress has been made in the last couple of days to refloat the northeast breakwater so it is fully on the surface and level. Kehoe will be working Saturday, and will have placed 1,200 floats by end of that day. We anticipate that by early next week, the northeast breakwater will be floating and functional. Once the …
Harbour West Attenuation Wall / Launch Update May 30
Update from City of Hamilton: Floating Breakwater – The entire north float tube has surfaced as of the evening of Thursday May 17th.. Approximately 5 sections (east side) of the centre and south float tubes have surfaced; the remainder are still submerged. – Kehoe Marine Construction is continuing with the placement of float barrels on the northeast breakwater, now attaching …
Lighthouse Tales
The Beach Canal Lighthouse Group and the Hamilton Port Authority are hosting an interesting evening of lighthouse talk. 6:30 pm Reception with appetizers 7:00 Introduction and welcome by Sandy Thomson, BCLG chairperson 7:15 Lighthouse Tales by guest speakers Wayne Wheeler and Mike Vogel 9:00 Closing Wayne Wheeler, “Mr. Lighthouse,” the president and founder of the U.S. Lighthouse Association will talk …
Harbour West Attenuation Wall / Launch Update – May 15, 2018
The City of Hamilton, Kehoe Marine Construction, and Brian Riggs Engineering are still developing an overall strategy for the wave attenuation wall. The wall will stay in place when raised and will remain there until a repair/replacement plan is determined. The extent of the damage will define the next steps in the process. Kehoe has been using dive bags and …
Harbour West Attenuation Wall / Launch Update – May 1, 2018
The City of Hamilton, Kehoe Marine Construction, and Brian Riggs Engineering are still developing a strategy for the wave attenuation wall. Kehoe will be installing dive bags and barrels to assist in raising the sunken breakwaters starting Friday May 4th. Please be respectful of the extensive operations with divers in the water by staying clear and keeping your wake to …
Lift Bridge Scheduling
Please be advised that during the full closures of the QEW, Skyway Bridge as outlined below, and at the request of the Ministry of Transportation, the Burlington Canal Lift Bridge will operate for pleasure craft at the top of the hour only, during the full closures. The first two scheduled full mainline closure of QEW/Burlington Bay Skyway (Toronto-Bound) are scheduled …
Harbour West Attenuation Wall / Launch Update
The City of Hamilton, Kehoe Marine Construction, and Brian Riggs Engineering will be meeting on Friday April 27th to develop a strategy for the wave attenuation wall. The underwater inspections have been completed and extent of the damage can now be assessed. Kehoe will be refloating the wave attenuating wall with dive bags, and it will be completed in two …
Harbour West – Storm Impact Update
Mother Nature has been letting us know winter is not quite over yet. This past weekend we sustained some damage from the storm that went through. There was a failure in the wave attenuating wall which led to some dock damage. The wave attenuating wall manufacturer, along with their engineers, were on the water assessing the situation yesterday. They have …